From:                              route@monster.com

Sent:                               Friday, April 15, 2016 10:19 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: CS UT

 

This resume has been forwarded to you at the request of Monster User xapeix03

William Stanley 

Last updated:  01/14/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Statesville, NC  28677
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: William Edward Stanley

Resume Value: ffjmzm3krwjv7gfv   

  

 

William Edward Stanley

3197 Hickory Hwy

Statesville, North Carolina 28677

336-669-8587

Wes_66@yahoo.com

 

Summary of Qualifications

+Hold an Active DOD security clearance with a proven record of reliability and responsibility.

+Ability to remain professional while handling critical incidents.

+Strong analytical skills.

+Capable of presenting researched information in the form of spreadsheets and courses of action.

+Capable of assessing complex problems and implementing appropriate solutions.

+Proficient in engineering inside and outside plant facilities in government, commercial and residential environments.

+Proficient in Excel and Word.

+Proven ability to manage schedules, assets, and material.

+Able to provide excellent results with no supervision.

 

Employment

2/2009 to Present-Gaits/Apptis/NCI-ISEC QA/QC

OSP/ISP Communications QA/QC I3MP (Installation Information Infrastructure Modernization Program)

Oversee detailed drawings for the construction and installation of outside and inside plant facilities.

QA outside plant construction including creation of detailed documentation and blueprint redlines creation of weekly and long term reports of the installation of manholes, duct runs, copper and fiber cables and the splicing and testing of those cables, and oversight of the work in the field.

QA detailed cut sheets and work sequences for rerouting existing copper and fiber facilities into new communications shelters and data and voice switches, for use by field technicians performing the work. Provide oversight of the cut over process in the field. 

 

4/2000 to 7/2008 Premise Networks, Graham North Carolina

Project Manager/ Electrical and Communications Tech.

Managed installation of OSP/ISP LAN Ethernet system duties include OSP manhole install and duct bank overbuild (electrical, fiber, CAT5e,CAT6). Electrical installation, demo and remodel of existing comm. closets.  Fiber installation of ISP duct work, installation of fiber backbone, splicing, termination, power meter and OTDR testing as well as installation of patch panel and LIU. Network connections to all CAT5e and fiber optic jumpers.

 

SPECIAL TRAINING:

SYSTEMAX SCS Engineer (Fiber and CAT6)                               Working knowledge (blueprints, plats, redlines)

Corning Fiber Optic Certification                                                     OSHA safety certifications

Seicor and Fujikora splicer                                                               CNC Programmer

Seicor power meter tester                                                                 Blueprint and Machining Certification

GN Nettest OTDR

Copper Test equipment

 

REFERENCES:

 

James Sartor

214-287-4341

 

Turk Vosa                                                                                    

712-260-6813

 

 

 

 

 

 



Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-NC-Western/Asheville